Introduction:
Series RCDC air cooled auto cleansing belt electromagnetic iron separator is added with a driving motor, two drums, an iron-cleaning belt on the foundation of sequence RCDA, also making use of an air blower for air cooling. This equipment is typically suspended above the conveyor belt, vibrating feeder or chute to collect magnetic factors specially ferrous elements from non-magnetic materials and cleanse the magnetic aspects immediately. This product has a strong magnetic depth and a long service existence. It is dust proof, waterproof, rapidly radiating, automobile cleaning and corrosion-resistant.
Electromagnetic separators are widely employed in the fields this kind of as electricity station, mines, metallurgy plants, building components, food, and many others. They have a lot of positive aspects, this kind of as lower temperature rise, very good insulation, robust magnetic force, reduced energy use and reputable overall performance.
Features:
— Strong magnetic intensity and specific design for magnetic circuit.
— The sealed composition helps make the separator drinking water-evidence, dust-evidence and corrosion resisting.
— Low power use.
— Easy to install and handy to use.
— High efficiency and stable overall performance.
General Dimension Drawing:
CZPT Parameters
NO. | Product | conveyor belt width (mm) |
Suspension peak (h=mm) |
Material depth (≤mm) |
Magnetic intensity (≥mt) |
Present power (≤kw) |
Belt velocity (m/s) |
Driving Energy (kw) |
Bodyweight (kg) |
Appearance size (mm) |
|||||
A | B | C | D | E | |||||||||||
one | RCDC-five | five hundred | one hundred fifty | a hundred | 60 | 1.two | four.five | 1.5 | 1080 | 1900 | 965 | 720 | 750 | 1030 | |
2 | RCDC-six | 600 | one hundred seventy five | a hundred and twenty | sixty | 2.5 | 1.5 | 1350 | 2050 | 1170 | 810 | 800 | 1150 | ||
three | RCDC-6.five | 650 | 200 | one hundred fifty | 70 | 3. | 1.5 | 1530 | 2165 | 1370 | 820 | 888 | 1233 | ||
4 | RCDC-8 | 800 | 250 | two hundred | 70 | 6. | 2.two | 2100 | 2350 | 1420 | 860 | 1031 | 1300 | ||
five | RCDC-10 | one thousand | three hundred | 250 | 70 | eight. | 3. | 3380 | 2660 | 1700 | 880 | 1231 | 1500 | ||
6 | RCDC-twelve | 1200 | 350 | 300 | 70 | eleven. | four. | 4150 | 2860 | 1850 | 950 | 1505 | 1700 | ||
seven | RCDC-fourteen | 1400 | 400 | 350 | 70 | 14. | five.5 | 5500 | 3225 | 2070 | 1571 | 1674 | 1950 | ||
8 | RCDC-16 | 1600 | 450 | four hundred | 70 | sixteen. | seven.five | 6900 | 3600 | 2270 | 1050 | 1874 | 2400 | ||
nine | RCDC-eighteen | 1800 | 500 | 450 | eighty | 20. | 7.five | 8800 | 4300 | 2570 | 1160 | 2100 | 2850 | ||
Observe:All themodels have T1,T2,T3design whose magnetic intensity is higher than standard.The magnetic 90mt,120mt and 150mt separately, Discard iron belt can be equipped with armor. |
FAQ
Q: Are you a factory ?
A:Yes,we are manufacturing facility, which was proven in 2006.
We focus on providing expert support such as design and style, manufacture, installation & servicing for the logistic industries & warehouse gear.
Q: Terms of Payment:
A:30% of the overall amount by TT as deposit, the balance to be paid out by TT or L/C at sight ahead of the equipment leaving seller’ manufacturing unit.
a hundred% irrevocable L/C at sight.
Q:Time for preparation of merchandise:
A:The above machines shall be ready for shipping during 45 days from the day of getting the deposit/LC, excluding the time of waiting for cargo. If there is any hold off of supply induced by seller, 3‰ of the complete amount shall be paid out to buyer each day, but this quantity shall not exceed the amount of deposit if the hold off is triggered by consumer, 3‰ of the overall amount shall be compensated to vendor every single working day, but this volume shall not exceed ten% of total benefit of devices.
Q:Assure period of time:
A:The promise period of time for the over machines is twelve months from the day of placing into use, but not exceeds 20-4 months soon after the equipment leaving seller’s factory. It is not relevant for rapid wear components.
Q: Might I know the position of my purchase?
A: Sure. We will send you info and photos at various production stage of your order. CZPTy phase will be send out to you in time.
Q: Can I customize shelving or racking at my own measurement?
A: Certain.
Q: If i want the total mineral processing line. is Baite able to support us construct it?
A: Yes, we can assist you merge a comprehensive mineral processing line. and give you related expert advice as lengthy as you want.
There is a wealthy expertise engineer staff of us. we experienced presently create several mining tasks in China & Abroad. You can feel our good quality and provider.
Why Pick us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
two.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
three.CZPT services
three.1 Design and style of production line and answers in accordance to buyer’s prerequisite.
three.2 In seven days soon after the receipt of deposit, the seller shall offer connected complex files for tools set up, in addition to individuals with special requirements.
three.three Just before supply, the seller can modify the previous solutions in accordance to buyer’s need.
4.Following-revenue provider
four.one For the duration of the set up and commissioning, the vendor shall send out technician to the site for instruction of set up and commissioning, and for education of employees.
four.2 If there is any gear failure induced by the consumer, the vendor shall help the servicing of equipment and substitution of fittings, and charges suitable expenses.
four.3 CZPT the promise time period, the seller can provide services and fittings at a most preferential price tag.
4.4The vendor can give session and inspection services freely for other goods, particularly for the up-stream and down-stream items of our equipment.
Workshop In excess of See: